Haggai Project Services
+44(0)7739 655668
Ardley EfW
As Viridor's Director of Engineering, Stephen was responsible for setting the engineering performance specification, and negotiating the EPC contract. He negotiated and implemented Owner’s Engineer and Independent Certifier appointments. Stephen set up Viridor's Major Project Governance systems and structures to support the successful and timely completion of this project. Stephen led the team that implemented client side delivery of planning and permit obligations, grid and other utility connections.
Energy from Waste
SUMMARY
Ardley EfW is a 26MW power plant running on 350,000 tpa of post recycled residual waste. It incorporates a 2 line MARTIN reverse acting grate, with a horizontal boiler running at 40bar/400C, supplied by EPC contractor CNIM/Clugston. FGT treatment is by hydrated lime and activated carbon. NOx treatment using SNCR injection of ammonia. This £220M capital investment was built on the back of Viridor's successful bid for the Oxfordshire residual waste contract.
LOCATION
Oxfordshire
YEAR
2016
CLIENT
Viridor Waste Management Ltd