Haggai Project Services
+44(0)7739 655668
Trident EfW
As Viridor's Director of Engineering, Stephen was responsible for setting the engineering performance specification, and negotiating the EPC contract. He negotiated and implemented Owner’s Engineer and Independent Certifier appointments. Stephen set up Viridor's Major Project Governance systems and structures to support the successful and timely completion of this project. Stephen led the team that implemented client side delivery of planning and permit obligations, grid and other utility connections.
Energy from Waste
SUMMARY
Trident Park energy from waste plant is a 30MW power plant running on 350,000 tpa of post recycled residual waste. It incorporates a 2 line MARTIN reverse acting grate, with a 5 pass boiler running at 40bar/400C, supplied by EPC contractor CNIM/Lagan. FGT treatment is by hydrated lime and activated carbon. NOx treatment using SNCR dry urea.
This £206M capital investment was built on the back of Viridor's successful bid for the Cardiff consortium Project Green residual waste contract.
LOCATION
Cardiff, Wales
YEAR
CLIENT
Viridor Waste Management